Lodge a Demolition Permit Application
Lodge a Demolition Permit Application
Lodge a Demolition Permit Application
Guiding information and access to online form to lodge a demolition permit application.
Last updated on: 04 September 2024
Demolition permit applications
A demolition permit is required before a structure can be demolished or removed from your property in the City of South Perth.
Application information
What is demolition works?
Is a demolition permit required for removing a building?
Asbestos requirements
Rodent baiting requirements
Septic tanks, leach drains and soak wells
Dust suppression on demolition sites
How long until my permit expires?
What happens when I have completed my demolition works?
Building application forms and checklist
Building application enquiries
Fees
Register or sign in
To submit an application, you will need to register or sign in for a mySouthPerth account. Click the Register and Sign In option at the top right of this page to proceed.
Already signed in?
If you see your initials at the top right-hand corner of this page, you are already signed in.
Submit an application
To submit an application, proceed below.
Before you begin
Prior to commencing the application via the link below, ensure you have an electronic copy (eg scan) of the following documentation prior to completing the application process:
- Application for Demolition Permit Form BA5
- Construction Training Fund Levy (CTF) receipt if contract value is over $20,000
- Site Plan (minimum scale1:200)
- Proof of disconnection of utilities (electricity, gas, water (sewer, cut and seal), etc)
- Rat Bait Certificate
- WorkSafe Asbestos Removal Licence (if applicable)
- Pre-demolition Asbestos Checklist (if applicable)
You will be required to attach this information during the application process.
Application attachments
Please ensure you are attaching all plans, materials and supporting information relevant to the application as part of your initial lodgement. Any omissions or additional materials will be required to be sent as separate emails, which will be limited to standard email size limitations (eg 10MB).
Lodgement guidance
Post lodgement process
Once your application is lodged, the following steps will apply:
- Your application will be reviewed to ensure all required information/documentation has been provided. You will be contacted if anything is missing
- When all documentation has been received, the lodgement process will be complete
- The application will then be assessed and can take up to 10 business days from acceptance for a decision.
Please take the time to check that the application is complete. An incomplete application may be returned and the fees forfeited.